2024
Last 6 bents installed and bridge repaired.

2023
Replaced main trestle with the exception of 6 bents.

2022
I finished the bridge, FINALLY and poured abutments to boot!

2021
We found our original water fall and stream had seen better days and leaked. We removed one fall and added a waterfall box to give us a bigger fall at the top. We purchased large flats stones to use for each fall.


Added passing siding.

Rebuilt rear trestle.

Removed switch from upper loop; converted connecting track to siding. Replaced roadbed behind rear trestle and in front of tunnel #5.

Added cribbing, retaining wall.

Removed and replaced two junipers and two boxwoods.
Removed dwarf white pine and created new community, White Rock, with three houses, a small depot and water tank.

Built Cranberry depot.

Refurbished Lily Candies/Pam’s General Store, Swanson Meats, PGE Bank, Tweetsie Diner and several houses.
Refurbished two water tanks.
Refurbished elevated crossing tower.



Summer 2003 – Yard added at Cranberry.

Fall 2012 – Pond rebuilt, added skimmer.

Spring 2013 – Long trestle Replaced, Howe truss bridge added.
Summer 2011 – Short trestle replaced, added truss bridge.
Summer 2006 – Added logging spur.
Summer 2005 – tunnel under upper loop near pond extended, crossing removed from other lower loop tunnel, track rerouted.